Barretine Group New Unit
Description
Construction work is well under way for a new storage warehouse for the Barretine Group
The slab has been prepared for concreting. This site is located in a high probability area for Methane Gas.
Land drains and exhausts have been designed to remove this potential build up from under the slab construction.
14/06/2018
Floor slab is now being laid and the ready mix concrete pumped into building.
The completion and hand over to the Barretine Group nearing conclusion.